Scotsman SLE400R Manual de servicio Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
Removal and Replacement: Refrigeration System
General Information
Work on the refrigeration system should only be
done when it is certain that the system needs
repair.
This ice machine use R-404A (HP62)
refrigerant and the compressor uses Polyol
Ester oil.
Do NOT use mineral oil in this refrigeration
system.
R-404A is a “near azeotrope” and therefore
liquid charging is required.
When the system is serviced, a special liquid
line dryer is required.
Polyol ester oil absorbs water very easily, and
when the system is opened for service, it
must be re-sealed as soon as possible (15
minutes maximum).
Special leak detection equipment is required
to locate small refrigerant leaks. Usually a
leak detector capable of detecting a
Halongenated refrigerant or HFC-134a will
work. Check with the leak detector
manufacturer if in doubt.
As with any other refrigerant, do not mix
R-404A with pressurized air when leak testing.
Evacuate the system to 200 microns before
charging.
Weigh the nameplate charge into the receiver.
SLE400R
January 1995
Page 24
Vista de pagina 23
1 2 ... 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios