Scotsman CME810 Especificaciones Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 50
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Ice Making Section Set Up
Rotate the ice making section as needed to access
the right side, where the refrigeration connections
will be made. Connect the suction line to the back
fitting. Connect the liquid line to the middle fitting.
Connect the vapor line to the front fitting.
See Coupling Connections on the next page for
detailed instructions.
After couplings are connected, add cork-tape type
insulation to exposed fittings to reduce
condensation potential.
Eclipseä 600, 800, 1000
April 2002
Page 23
Refrigerant Lines, Shown Routed Out The Top
Add
insulation
Suction
Vapor
Liquid
Refrigerant Lines, Shown Routed Out the Back
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 49 50

Comentarios a estos manuales

Sin comentarios