
Start Up – Air and Water Cooled
• Reservoir emptied and refilled
– Purge valve opens, water pump starts
– Hot gas and harvest assist solenoid activate
– Inlet water valve opens, water fills the reservoir
– Purge valve closes, pump shuts off
• When the reservoir is full, the water stops and
the compressor and pump start
– Fan motor will start when discharge pressure
increases to cut in point of fan cycle switch
Comentarios a estos manuales